THIRD RUNWAY CONCOURSE
Third Runway Concourse
BIM MODELLING / BIM SPECS / BEP / CLASH / 4D / LOD350
Client
Confidential
Location
Hong Kong
Date of Completion
2024
Project Value
HKD 141.5 Billion
GFA
280,000 sqm
Duration
7 months
Overview
For the new third runway, we modeled various components of the architecture, structure and MEP, including tunnels for automated people movers and BHS, and produced Tender Docs at LOD350.
We were responsible for the coordination between all consultants to resolve clashes. We used BIM for ATC sightline checks and walkthrough checks. The BIM model was also used for the production of 2D drawings from the 3D model.
Third Runway Concourse
BIM MODELLING / BIM SPECS / BEP / CLASH / 4D / LOD350
Client
Confidential
Location
Hong Kong
Date of Completion
2024
Overview
For the new third runway, we modeled various components of the architecture, structure and MEP, including tunnels for automated people movers and BHS, and produced Tender Docs at LOD350.
We were responsible for the coordination between all consultants to resolve clashes. We used BIM for ATC sightline checks and walkthrough checks. The BIM model was also used for the production of 2D drawings from the 3D model.
Project Value
HKD 141.5 Billion
GFA
280,000 sqm
Duration
7 months