Scope of Work

Scan to BIM, BIM Authoring, LOD400

Project

In this scope BIM technology is adopted in the preliminary design, technical and impact assessments, detailed design, tendering and construction for SHW WTW extension and associated water pumping stations and water transmission system.

All information was to be model first for the existing conditions and will be given to all the design consultants. The client wanted a model that was completely clash-free and free of any modelling errors for the existing structure.

Location

Hong Kong

Year

2019

Client

JBA Surveys

GFA

15,000 sqm

WSD Pump Station