top of page
Scope of Work
Scan to BIM, BIM Authoring, LOD400
Project
In this scope BIM technology is adopted in the preliminary design, technical and impact assessments, detailed design, tendering and construction for SHW WTW extension and associated water pumping stations and water transmission system.
All information was to be model first for the existing conditions and will be given to all the design consultants. The client wanted a model that was completely clash-free and free of any modelling errors for the existing structure.
Location
Hong Kong
Year
2019
Client
JBA Surveys
GFA
15,000 sqm
WSD Pump Station
bottom of page