top of page
Scope of Work
BIM Authoring, Clash Management, BIM Management, LOD400
Project
This project consists of a 28-level,
488-room hotel with ground-floor restaurant; and a second tower, NV Apartments, a 33-level, 401-apartment building.
We were asked to assist in coordinating the structure of the building with Structural Revit Model. Part of the process involved modeling all the main structural elements that would be used for detecting clash collision. These clash reports helped identifying the clashes before the construction began.
Location
Perth, Australia
Year
2019
Client
i2C / Probuild
GFA
25,000 sqm
Murray St Twin Towers
bottom of page