top of page
BIMCAP_White.png
Scope of Work

4D Construction, Clash Management, LOD400, BIM Management

Project

Scope of works included the creation of the HZMB road to demonstrate the revised width of the bridge to ensure that corners were visible from a certain distance to ensure road safety.

A revit model up to levels of detail 350 was created from 2D drawings including structure and civil engineering drawings. Part of the scope was to provide an 4D animation with moving cars and animated graphics, for this we used Fuzor.

Location

Hong Kong

Year

2019

Client

Dragages

GFA

55 km

HZMB Road Link

bottom of page