top of page
Scope of Work
BIM Authoring, As-Built, Scan to BIM, Clash Management, BIM Management, BIM Specs, LOD500
Project
The existing Riverside Stand at the Craven Cottage in Fulham is to be demolished and redeveloped. The newstand will have an increased seating capacity for match day football arranged in two tiers, with accommodation associated with modern sports uses.
BIMCAP was engaged with the Interior Designer to prepare the 3D BIM modelling at LOD 200. We are also tasked with conducted clash analysis on a regular basis to provide a clash-free model.
Location
Fulham, United Kingdom
Year
2023
Client
Undisclosed
GFA
18,000 sqm
Fulham Stadium
bottom of page