Scope of Work
4D Construction, LOD400, BIM Management
Project
We used BIM to assist engineers to coordinate the MEP system inside the tunnels at various stages of the project. We were also responsible to produce all the 2D drawings from the 3D model as per client’s design and scope of works.
3D tools and implementation of BIM VR were used to coordinate all disciplines with models from all the other consultants in order to prevent and resolve coordination clashes.
Location
Hong Kong
Year
2018
Client
Dragages
GFA
17 km