top of page
BIMCAP_White.png
Scope of Work

4D Construction, LOD400, BIM Management

Project

We used BIM to assist engineers to coordinate the MEP system inside the tunnels at various stages of the project. We were also responsible to produce all the 2D drawings from the 3D model as per client’s design and scope of works.

3D tools and implementation of BIM VR were used to coordinate all disciplines with models from all the other consultants in order to prevent and resolve coordination clashes.

Location

Hong Kong

Year

2018

Client

Dragages

GFA

17 km

Diamond Hill Fung Tak Interchange

bottom of page