Client
Dragages
Year
2019
GFA
55 km
Location
Hong Kong
HZMB Road Link
4D Construction, Clash Management, LOD400, BIM Modelling





HZMB Road Link
Continent
Asia
Location
Client
Dragages
GFA
55 km
Year
2019

Project
Scope of works included the creation of the HZMB road to demonstrate the revised width of the bridge to ensure that corners were visible from a certain distance to ensure road safety.
A revit model up to levels of detail 350 was created from 2D drawings including structure and civil engineering drawings. Part of the scope was to provide an 4D animation with moving cars and animated graphics, for this we used Fuzor.