top of page

Client
Dragages
Year
2018
GFA
17 km
Location
Hong Kong
Diamond Hill Fung Tak Interchange
4D Construction, LOD400, BIM Modelling





Diamond Hill Fung Tak Interchange
Continent
Asia
Location
Client
Dragages
GFA
17 km
Year
2018

Project
We used BIM to assist engineers to coordinate the MEP system inside the tunnels at various stages of the project. We were also responsible to produce all the 2D drawings from the 3D model as per client’s design and scope of works.
3D tools and implementation of BIM VR were used to coordinate all disciplines with models from all the other consultants in order to prevent and resolve coordination clashes.
bottom of page


