top of page
Porfolio Hero Image_edited.jpg
Client

JBA Surveys

Year

2019

GFA

15,000 sqm

Location

Hong Kong

WSD Pump Station

Scan to BIM, BIM Authoring, LOD400

Porfolio Hero Image_edited.jpg
Portfolio curve off-white.png
Portfolio curve off-white.png
Porfolio Hero Image_edited.jpg
Portfolio curve.png

WSD Pump Station

​

Continent

Asia

Location

​

Client

JBA Surveys

GFA

15,000 sqm

Year

2019

Portfolio curve.png

Back To Portfolio

Project

In this scope BIM technology is adopted in the preliminary design, technical and impact assessments, detailed design, tendering and construction for SHW WTW extension and associated water pumping stations and water transmission system.

All information was to be model first for the existing conditions and will be given to all the design consultants. The client wanted a model that was completely clash-free and free of any modelling errors for the existing structure.

bottom of page