Overview

In this scope BIM technology is adopted in the preliminary design, technical and impact assessments, detailed design, tendering and construction for SHW WTW extension and associated water pumping stations and water transmission system. 

All information was to be model first for the existing conditions and will be given to all the design consultants. The client wanted a model that was completely clash-free and free of any modelling errors for the existing structure. 

Scan to BIM, BIM Modelling, LOD400

WSD Pump Station

Date of Completion

2019

GFA

15,000 sqm

Duration

11 months

Client

JBA Surveys

Location

Hong Kong

Project Value

Undisclosed

Follow us

Facebook

Instagram

Netherlands

+31 8 50 1304 72

Ertskade 248, 1019BB,
Amsterdam

Hong Kong

+852 2237 1588

Unit 1B,

28-32 Gage St, Central

Philippines

+632 8535 0068 

Unit 1104 Antel Global Centre,

Doña Julia Vargas Ave,

Ortigas Center, Pasig City

Hungary

+36 1 279 0450

1st Floor, 1097 Budapest,

Konyves Kalman krt.11

Germany

+49 1520 4885789

Auf der Heide 21
D-32108 Bad Salzuflen

Spain

+34 657 92 63 59

  • Facebook
  • Instagram