Overview

In this scope BIM technology is adopted in the preliminary design, technical and impact assessments, detailed design, tendering and construction for SHW WTW extension and associated water pumping stations and water transmission system. 

All information was to be model first for the existing conditions and will be given to all the design consultants. The client wanted a model that was completely clash-free and free of any modelling errors for the existing structure. 

Scan to BIM, BIM Modelling, LOD400

WSD Pump Station

Date of Completion

2019

GFA

15,000 sqm

Duration

11 months

Client

JBA Surveys

Location

Hong Kong

Project Value

Undisclosed