top of page
Overview
Existing theme park to be redeveloped into a new theme ride. The new design would complete strip external and internal spaces leaving only the core shell.
BIMCAP scope of works include modeling existing CAD drawings surveys, and all other consultants information such the architecture, structure, facade, interior, MEP up to LOD 400. As part of the package we had to create all drawings for building regulations from the BIM model.
4D, 5D, BD, BEP, LOD400
Lantau Theme Park
Date of Completion
2019
GFA
55 Kilometres
Duration
8 months
Client
Dragages
Location
Hong Kong
Project Value
HKD 138 Billion