Overview
This project is a modern, multi-customer logistics space four-storeys with truck berths on all floors accessed by separate up and down ramps. Flexible design and specification to meet customers’ requirements including custom racking and material handling systems.
BIMCAP scope of work included the design of the facade for one of their main tenants BMW. To maximize efficiency and minimize errors, the client wanted to do everything within a BIM environment.
Logistic Centre
FAÇADE DESIGN BIM / VR / LOD300
Client
Undisclosed
Location
Chiba, Japan
Date of Completion
2019
Overview
This project is a modern, multi-customer logistics space four-storeys with truck berths on all floors accessed by separate up and down ramps. Flexible design and specification to meet customers’ requirements including custom racking and material handling systems.
BIMCAP scope of work included the design of the facade for one of their main tenants BMW. To maximize efficiency and minimize errors, the client wanted to do everything within a BIM environment.
Project Value
HKD 2.3 Billion
GFA
116,000 sqm
Duration
4 months