HZMB ROAD LINKS
HZMB Road Link
4D / CGI / CLASH / LOD350
Client
Dragages
Location
Hong Kong
Date of Completion
2019
Project Value
HKD 138 Billion
GFA
55 Kilometres
Duration
4 months
Overview
Scope of works included the creation of the HZMB road to demostrate the revised width of the bridge to ensure that corners were visible from a certain distance to ensure road safety.
A revit model up to levels of detail 350 was created from 2D drawings including structure and civil engineering drawings. Part of the scope was to provide an 4D animation with moving cars and animated graphics, for this we used fuzor.
HZMB Road Link
4D / CGI / CLASH / LOD350
Client
Dragages
Location
Hong Kong
Date of Completion
2019
Overview
Scope of works included the creation of the HZMB road to demostrate the revised width of the bridge to ensure that corners were visible from a certain distance to ensure road safety.
A revit model up to levels of detail 350 was created from 2D drawings including structure and civil engineering drawings. Part of the scope was to provide an 4D animation with moving cars and animated graphics, for this we used fuzor.
Project Value
HKD 138 Billion
GFA
55 Kilometres
Duration
4 months